eschen-350The Eschen Pool Deck was was constructed in 2001. TRC poured all of the architectural concrete on the project including columns, patios and of course the 2800 SF pool deck. The coping was poured with white cement and a Carmel colored pigment and featured an ornate bullnose form to provide the cantilever nosing. The pool deck had a dust on color applied and was acid stained with an amber one week after the pour. TRC was asked in May of 2012 to refurbish the pool deck and apply an acid stain and sealer; judge for yourself but we found the results stunning.