The Public Storage Building was completed in 1997 and Tom Ralston Concrete poured all of the concrete for the 125,000 SF facility including the slab/foundation. Slabs for the second story were placed on pan decking. The project went smoothly and over 3,000 yards of concrete were placed on and off-site for this project. TRC used a ride-on machine to finish many of the large slabs.