The Caldwell masonry project consisted of walkways and a sizeable pool deck veneered in large pieces of Arizona Flagstone. TRC spent over 3-months on the Los Altos project beginning with lots of demolition then pouring concrete sub-bases, walls and columns. New flagstone steps and risers were constructed while existing brick porches and steps were left to tie in nicely with the rose colored Arizona flagstone.