Pacific Avenue High Rise
Tom Ralston Concrete was asked to help out a local business with the floors in a High Rise in Downtown Santa Cruz. Santa Cruz is not known for high rises and this particular five story building had post tension slabs that were 18" thick and each pour was over 200 yards. The last floor had to be poured by using a 75 ton crane and a concrete bucket.